BOIMASS PLANT IN MONTBRISON

17/11/2020 The Beauregard district of Montbrison is at the heart of a Loire Habitat programme of renovation and refurbishment, with objectives relating to energy performance. The project is part of

Share
HOT AIR GENERATORS FOR FORESTRY MANAGEMENT COMPANIES

12/11/2020 Comerc, a Polish manufacturer of wood pellet and briquette production lines, has installed pellet manufacturing equipment at 2 Russian forest management companies. Each production line integrates a hot air

Share
REPLACEMENT OF THE BIOMASS BOILER OF THE SCHOOL COMPLEX FIUMORBU

10/11/2020 The Executive Council of Corsica has launched a plan to improve the energy performance of the buildings belonging to the local authority, including schools, whose energy costs represent a

Share
A BOIMASS BOILER FOR ITALY

05/11/2020 In partnership with our distributor in Italy MEPE, COMPTE.R will supply a biomass boiler to the company SEA Ambiente. SEA Ambiente is an industrial company specialising in wastewater treatment

Share
WOOD INDUSTRY ANDREWEX – CLIENT OF COMPTE FORTECH

03/11/2020 The Andrewex Group – ABWood has been a Polish family-owned company in the wood industry for more than 30 years. The company specialises in the production of furniture, garden

Share
NEW ECOLOGICAL HIGH SCHOOL IN CLERMONT FERRAND

  27/10/2020 COMPTE.R will supply and install 3 wood pellet boilers with a total output of 650 kW in the future high school in the St-Jean district of Clermont Ferrand.

Share
INAUGURATION OF THE VALENCE BIOMASS HEATING PLANT

  12/10/2020 On 6/10/2020 was inaugurated the biomass boiler room , supplying the heating network of the City of Valence. Equipped with two biomass boilers COMPTE.R of 3.7 and 6

Share
BIOMASS BOILER COMPTE.R FOR DELLE

  06/10/2020 Following the rehabilitation and demolition of part of the La Voinaie district in Delle, Territoire Habitat decided to undertake an energy rehabilitation of this district. All the insulation

Share
COMMISSIONING OF THE BIOMASS BOILERS OF VILLA NURSERY

  29/09/2020 Last September, COMPTE.R carried out the start-up and operational commissioning of two 2.5 MW biomass-fuelled boilers for the production of hot water to heat the greenhouses of VILLA

Share
DELIVERY OF THE BIOMASSE BOILER TO GERBOIS

15/09/2020 Last September COMPTE.R delivered the 2 MW biomass boiler to Gerbois (Sapois). The boiler is due to be commissioned in October.

Share