19 August 2021 by compte-r in News 14/08/2021 The delivery and assembly of the equipment at Engelvin Bois Moulé took place at the beginning of August. The front end is suitable for a 2.5 MW superheated air production and a 1 MW hot water production. 0 Like! Recommend Share Tagged in