';
  • en
  • fr
  • es

27/09/2021

As part of the construction of the museum complex in Château Chinon, the HVAC company Roche – CEME was awarded the project’s HVAC package.

For the supply of biomass boilers, Roche has placed its trust in COMPTE.R.

Following delivery in September 2021, the Cité’s boiler room was equipped with three PELLETECH boilers with a total output of 700 kW, fuelled by forestry chips.

The boilers meet the requirements of the EN303-5 standard and comply with the discharge and performance criteria of the ADEME heat fund.

Recommend
Share
Tagged in