DELIVERY OF 2 BIOMASS BOILERS FOR KRONOSPAN

01/03/2018   COMPTE Fortech will supply 2 biomass boilers of 2 MW each for Kronospan, a plywood and chipboard company in Szczecinek, Poland. The wood processing company will thus be

Share
DELIVERY OF THE BIOMASS BOILER IN MODANE

    26/02/2018   The construction work of the biomass boiler room that will supply the heat network of the city of Modane is coming to the end. The 400

Share
BIOMASS BOILERS FOR BELARUSSE LOGICTICIEN

23/02/2018   KOMKONT supplied and commissioned two biomass boilers of 1,2 MW each one for the  Minsk subsidiary company of groupe Beltamogeservice, the largest operator in the logistics services market

Share
INAUGURATION OF THE BIOMASS BOILER IN CHAUMONT

    22/02/2018   The 16th of February was inaugurated the biomass boiler of the heating district of the city of Chaumont. This boiler room is equipped with a 2.8

Share
GROUP COMPTE.R DEVELOPMENT STRATEGY 2018-2021

08/02/2018 Group COMPTE.R development strategy for 2018-2021   Group COMPTE.R 4 years vision In 2021, Group COMPTE.R : a European leader in the design, construction and service of installations for all types

Share
KOMKONT EQUIPS THE HEATING DISTRICT OF VORONOVO (BELARUS)

  02/02/2018   The heating district of the town Voronovo (Belarus) is equipped with two 2,5 MW biomass boilers supplied and commissioned by KOMKONT.    

Share
TWO WASTE WOOD BOILERS FOR SAGAMI GREENHOUSE

02/02/2018   COMPTE Fournier will supply and commission 2 biomass boilers of 8 MW Sagami Greenhouse (Canada). The boilers will burn the waste wood, their design with cooled grid and 3

Share
GREENHOUSE TOPOR TRIPLED HIS CONFIDENCE IN COMPTE FORTECH

01/02/2018   COMPTE Fortech will supply and commission the 2 MW biomass boiler for greenhouse Topor (Poland). Director of the company Adam Czarnogórski for the third time renews his confidence

Share
BIOMASS BOILER OF 2 MW IN OULIANOVSK (RUSSIA)

  21/12/2017   KOMKONT supplied and commissioned 2 MW biomass boiler for the doors manufacturer PALMIRA in Oulianovsk, the Russian leader in his field. As fuel is used the waste

Share
DELIVERY OF THE BIOMASS BOILER TO BURGOS

The biomass boiler of 1500 kW for the district heating of Fuentes Blancas in Burgos (Spain) has been delivered. The mounting is in progress  and the commissioning  is planned for

Share