12/09/2023 In autumn 2023, work will start on the construction of a heating network in La Talaudière, with commissioning scheduled for September 2024. This 10th district heating network, managed
29/08/2023 COMPTE.R has supplied ELVA joinery with an 800 kW biomass boiler with a cyclone furnace. The boiler will be fuelled with chips from the processing of natural wood.
08/08/2023 The 8 MW COMPTE.R boiler for the new biomass heating plant in Dole’s district heating network was delivered in July 2023. Its commissioning, scheduled for the end of
17/07/2023 As part of the construction of a new additional boiler house on the existing site of the main boiler house, Idex Energies awarded COMPTE.R a contract to supply
04/07/2023 COMPTE.R has teamed up with its former customer Meris to supply and install a biomass boiler on the site of a Stam cereal and vegetable grower. The 3
20/06/2023 In July 2024, COMPTE.R will be installing a new cyclone-fired biomass boiler to replace the old boiler (in service for over 20 years) at our customer, the Laouet sawmill.
06/06/2023 Agronutris, a French biotechnology company specialising in the breeding and processing of insects for food, will shortly be opening its second 40,000 m² plant in Rethel (Ardennes), close
16/05/2023 As part of the supply, installation and commissioning of a biomass boiler and associated equipment, COMPTE.R has supplied a 3.5 MW boiler for the Mérignac heating network. The
02/05/2023 The AR Bois sawmill, formed from the merger of the Dutch group Rollé and the Ageorges sawmill in Montgivray (36), has been a COMPTE.R customer since 1998. A
27/04/2023 COMPTE.R will supply a 2.6 MW boiler to Société Méridionale de Caisserie (PGS Group), as part of the company’s sustainable development objectives, which include significantly reducing the carbon