31 January 2022 by compte-r in News 08/02/2022 Engie East London Energy Limited has reappointed COMPTE.R to replace the biomass boiler at the Kings Yard site in London with a new state-of-the-art boiler. A 3.5 MW boiler will be delivered in July 2022. 0 Like! Recommend Share Tagged in