';
  • en
  • fr
  • es

08/02/2022

Engie East London Energy Limited has reappointed COMPTE.R to replace the biomass boiler at the Kings Yard site in London with a new state-of-the-art boiler.

A 3.5 MW boiler will be delivered in July 2022.

 

Recommend
Share
Tagged in