18/02/2020
The COMPTE.R boiler for the biomass plant of the Vitry le François heating network was delivered in the Desert district.
The construction of the new boiler house and the extension of the district heating network is in full swing.
Replacing the old wood-fired boiler room will supply 54% of Vitry le François households with renewable energy. Nearly 3,000 homes will benefit from the reduction in VAT to 5.5% for green energy.





