';
  • en
  • fr
  • es

 

05/06/2018

As part of an energy performance operation, the Regional Council has validated the project of the creation of a mixed wood, geothermal and gas boiler with the creation of indoor heating networks at the Professional College Val de Cher in Saint Aignan. .

The wood heating will be provided by the 200 kW boiler supplied by COMPTE.R.

Recommend
Share
Tagged in