';
  • en
  • fr
  • es

12/11/2018

For the replacement of their biomass boiler the carpentry LCM has renewed its confidence in COMPTE.R.

The 350 kW hot air generator delivered and installed in November will make it possible to valorize the carpentry production waste by using it as fuel.

Recommend
Share
Tagged in