';
  • en
  • fr
  • es

 

07/03/2023

After installing a 1500 kW boiler at Sanijura in 2008, in spring 2024 COMPTE.R will replace the existing boiler with a state-of-the-art 3 MW boiler.

Sanijura (Kohler Group), a manufacturer of kitchen furniture, expanded in 2018 with the construction of a new logistics building, a raw materials shop and an extension to its lacquering workshop.

The new boiler, like the previous one, will be fuelled by particleboard waste from the company’s production.

 

 

Recommend
Share
Tagged in