29 June 2018 by compte-r in News 19/06/2018 COMPTE.R will install a new boiler at the Daniel Lescot sawmill in Remondans-Vaivre. This 900 kW biomass boiler fed by sawmill production waste will replace the old boiler of the same brand that had been in operation since 1997. 0 Like! Recommend Share Tagged in