';
  • en
  • fr
  • es

12/02/2019

The boiler room at the Albert Londres High School in Cusset has received its new biomass boiler.

The 1800 kW, new generation Low NOx boiler is equipped with a COMPTE.R bag filter to guarantee dust emissions below 15 mg / Nm3 at 6% O2.

The renovation of the boiler house is part of the partnership set up by Allier Habitat with the SDE 03 and the Auvergne-Rhône-Alpes region for the creation of a biomass production heating network.

Thus, 278 homes will be connected to the wood boiler at the Albert-Londres high school in Cusset. This new heating network will be managed by the SDE 03 and will include the buildings of the Auvergne-Rhône-Alpes region (Lycée Albert Londres), the town hall of Cusset (school Lucie-Aubrac, social center and gymnasium) and the buildings of Allier Habitat.

 

Recommend
Share
Tagged in